CS12 — Display Multilevel BOM
CS12 displays a multilevel material BOM explosion, showing the complete component structure through lower-level assemblies. SAP's current BOM documentation distinguishes CS12 from CS11 Display BOM Level by Level and CS13 Display Summarized BOM. Use CS12 when the complete nested hierarchy of a finished or semi-finished material must be analyzed in one multilevel result.
CS12 is the multilevel BOM explosion view for analyzing a complete nested material structure. This reference distinguishes it from CS11 level-by-level display, CS13 summarized component totals, and CS15 where-used analysis, and explains the plant, usage, alternative, key-date, quantity, and engineering-change context required for an accurate BOM comparison. For reliable production support, compare the same top material, plant, BOM usage, alternative determination, key date, change-number context, and explosion quantity before concluding that two multilevel explosions disagree. The hierarchy matters because a component can occur under different subassemblies with different effective quantities.
Published 20 Sept 2026· 469 words
Diese Seite ist noch nicht auf Deutsch verfügbar.
Purpose
CS12 explodes a material BOM through multiple levels and displays the hierarchical component structure. It is suited to analyzing the full nested BOM rather than a single-level/level-by-level view or a quantity-summarized component list.
When it is used
Use CS12 when planners, engineers, costing teams, or support consultants need to see how subassemblies and lower-level components roll into a top material across the full BOM hierarchy.
How to use it in practice
- Enter material, plant, BOM usage/application, quantity, and key date.
- Review alternative-BOM determination and explosion controls.
- Execute the multilevel explosion and trace parent/child relationships through the hierarchy.
- Check validity/change-number context for components that appear or disappear by date.
- Use CS13 when you need aggregated totals rather than hierarchy.
Key data objects
These selection and result fields determine how the BOM explosion should be interpreted.
- Top material/plant and explosion quantity.
- BOM usage/application and alternative.
- Hierarchy level and parent-child component relationship.
- Component quantities scaled by the explosion quantity.
- Validity/change-number context.
How to prove it in the data
Repeat the report with the same material, plant, BOM usage/application, alternative logic, explosion quantity, and key date, then compare the result with the material BOM in CS03. If a component differs, check its validity, alternative BOM, change-number effect, item quantity, and parent assembly before treating the report as inconsistent.
ECC vs S/4HANA
SAP's current S/4HANA BOM feature comparison identifies CS12 as Display Multilevel BOM. Fiori BOM-explosion apps may provide additional UI options, but CS12's multilevel hierarchy remains distinct from CS13's summarized output.
Common pitfalls and how to diagnose them
- Calling CS12 the summarized BOM; CS13 is the summarized transaction.
- Using a key date that selects a different BOM version.
- Ignoring phantom/assembly behavior when interpreting levels.
- Comparing component quantities across explosions with different base quantities.
Whose problem this is
Primary ownership is PP/Engineering BOM master data. Production Planning, Product Costing, and engineering-change owners join according to the business question. ABAP is relevant only when custom explosion logic or enhancements are proven to be involved.