SAP transaction codes
- CA01Create Routing for Production Operations
- CA02Change Routing Task List
- CA03Display Routing (Task List)
- CO01Create Production Order
- CO02Change Production Order
- CO03Display Production Order
- CO11NProduction Order Confirmation Single Screen
- CO15Production Order Confirmation Transaction CO15
- COOISProduction Order Information System List
- COR1Create Process Order
- COR2Change Process Order
- COR3Display Process Order
- CR01Create Work Center
- CR02Change Work Center
- CR03Display Work Center Master Data
- CS01Create Material BOM
- CS02Change Material BOM
- CS03Display Material BOM
- CS11Display Multi-Level BOM Explosion
- CS12Summarized Multi-Level BOM Explosion
- CS13Where-Used List for Material in BOMs
- MD01Total Planning Run for a Plant
- MD02MRP Single-Item Multi-Level Planning Run
- MD03Single-Item Single-Level MRP Run
- MD04Stock/Requirements List Display
- MD05MRP List Display
- MD61Create Planned Independent Requirements
- MD62Change Planned Independent Requirements
SAP tables
- AFKOOrder Header Data for PP Orders
- AFPOProduction Order Item Table
- AFRUAFRU Order Confirmation Table
- AFVCOrder Operation Table AFVC
- AFVUOrder Operation User Fields Table
- AFVVOrder Operation Quantities and Dates
- CRCAWork Center Capacity Category Assignment Table
- CRHDWork Center and Resource Header Table
- KAKOCosting Header for Product Cost Estimates
- KAZYPeriodic Cost and Quantity Distribution Table
- MASTMaterial to BOM Link Table
- MDKPMRP List Header Table
- MDTBMRP List Item Table (Cluster)
- PBEDIndependent Requirements Period Data Table
- PBIMPBIM - Independent Requirements Material Header
- PLAFPLAF Planned Order Table in PP
- PLASPLAS Task List Selection Table
- PLFLTask List Sequence Relationships Table
- PLKOTask List Header Table PLKO
- PLPOPLPO - Routing Operations and Standard Values
- RESBRESB Reservation and Dependent Requirements Table
- STASSTAS - BOM Item to Operation Allocation Table
- STKOBOM Header Table STKO
- STPOBOM Item Table STPO
SAP BAPIs
- BAPI_MATERIAL_BOM_GROUP_CREATECreate a Material BOM Group via BAPI
- BAPI_PLANNEDORDER_CREATEBAPI_PLANNEDORDER_CREATE creates a planned order
- BAPI_PRODORD_CREATECreate a Production Order via BAPI
- BAPI_PRODORD_GET_DETAILRead Production Order Header, Operations and Components
- BAPI_PRODORD_RELEASEBAPI to release production orders
- BAPI_PRODORDCONF_CREATE_TTMass confirmation BAPI for production and process orders
- BAPI_ROUTING_CREATEBAPI_ROUTING_CREATE for Routing Master Data
SAP functional issues
- Backflush failing at order confirmationBackflush Failing at Order Confirmation
- BOM component not exploding in the production orderBOM Component Missing From Production Order
- Capacity overload on the work centreDiagnosing Capacity Overload on a Work Centre
- Confirmation posting a goods movement errorGoods Movement Error During Order Confirmation
- Costing run not picking up the new material priceCosting Run Ignoring an Updated Material Price
- MRP not generating a planned order for a required materialMRP Fails to Create a Planned Order
- Planned order not convertible to a production orderPlanned Order Cannot Be Converted
- Production order not releasing due to missing componentsProduction Order Blocked by Missing Component Availability
- Production order remains technically incomplete at settlementOrder Stuck Incomplete During Settlement
- Routing not selected for the production orderProduction Order Created Without a Routing